"C","91³Ô¹ÏÍø. Morning Report" "C","Filename: morning_report_20240726_20240726074509000.csv" "C","Report for 07/26/2024" "C","Report generated 09/07/2024 21:01:50 EDT" "H","Report Type","Status" "D","Morning Report","Final" "H","Section 1. Report Date","Report Time" "D","07/26/2024","00:00:00" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","07/25/2024","19","17933" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",27321 "D","B. Capacity Additions EcoMax Bid > CSO",1077 "D","C. Generation Outages and Reductions",2714 "D","D. Uncommitted Available Generation (Non-fast start)",5402 "D","E. DRR Capacity",219 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",-225 "D","NB",66 "D","NYISO AC",-1344 "D","NYISO CSC",330 "D","NYISO NNC",132 "D","Phase 2",-1485 "D","Net Deliveries",-2526 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",23015 "D","I. Peak Load Forecast For Hour Ending19",18000 "D","J. Total Operating Reserve Requirement",2406 "D","K. Capacity Required = I + J",20406 "D","L. Surplus = (+) Deficiency = (-) (H - K)",2609 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",2449 "D","Section 4. Largest First Contingency MW",1485 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",24553 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1782 "D","Ten Minute Reserve Estimate:",1782 "D","Thirty Minute Reserve Requirement:",624 "D","Thirty Minute Reserve Estimate:",3233 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,50,-225 "D","NB",-500,400,66 "D","NYISO AC",-1400,1200,-1344 "D","NYISO CSC",-346,330,330 "D","NYISO NNC",-200,200,132 "D","Phase 2",-2000,1200,-1485 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Partly cloudy","SE 7",77 "D","Hartford","Mostly clear","NW 8",80 "H","Section 9. SAR Available","Value" "D","NYISO","Yes" "H","Section 10. Capacity of Non-Commercial Units" "D","Total Available",0 "H","Section 11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 12. Geomagnetic Disturbance Activity" "H","Description","Value" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","none" "D","Actions Taken or Planned by Other Control Areas:","none" "T","46 lines"